Archive for November, 2012

How to Install Bar Rail

How to Install Bar Rail A short guide to installing Chicago style bar rail: The tools we will be using to fit and install the bar rail molding are a drill, glue, screws, spoil board, biscuit joiner, and biscuits. The sub top should extend out beyond the main bar top 1 and 9/16″ as shown. We first set up the spoil board to hold the bar rail up in position while cutting. We set the miter box angle at 45 degrees and position the bar rail on the spoil board to make the first cut. Next, we reset the miter…

Read More »

That bar rail was perfectly manufactured and well wrapped for shipment. Delivery was prompt and customer service was great as well. I would highly recommend using this company.

Raul M. – Brockton AL

10/13/18

A great product! Ordered cherry 475 Bar Rail, when I received the shipment it was in perfect condition. What I really liked about it, each piece of the bar rail had a slight crown which was perfect when clamping on the sub bar top in the middle the ends fit tightly and it was easy to get a great fitting joint. If that was designed like that, good job. Thanks for putting out a quality product.Ron S 2Ron S. – Brush, Colorado

02/18/19

Thanks for putting out a quality product!