How to Install Bar Rail

How to Install Bar Rail

A short guide to installing Chicago style bar rail: The tools we will be using to fit and install the bar rail molding are a drill, glue, screws, spoil board, biscuit joiner, and biscuits. The sub top should extend out beyond the main bar top 1 and 9/16″ as shown. We first set up the spoil board to hold the bar rail up in position while cutting. We set the miter box angle at 45 degrees and position the bar rail on the spoil board to make the first cut. Next, we reset the miter box to the opposite 45 degree angle and position the other piece of bar rail for another cut.After making both cuts we check the pieces for proper fitment and make any adjustments, if needed. Now we can drill pilot hols every 12 inches in our sub-top. We decided to make a biscuit joint on the bar rail miter for added strength, but this step is optional. Now we are apply glue to the sub-top and to the top notch of the bar rail. Make sure to brush ou the glue on the sub-top and on the bar rail for a closer fit. After applying the glue we use clamps with blocking to hold the bar rail in position. Finally, using the pilot hols that we drilled earlier, we can secure the bar rail to the bar top from underneath with screws. After some light sanding and applying a finish, the bar top will be ready to use. For more information and to purchase par rail, please call (301) 665-9505 or check out our bar rail store.

 

Save

Tags: Posted in: Bar Building, Bar Rail Installation, Bar Rails, Chicago Bar Rails

Leave a Reply

Thank you Paul,

Great job on the walnut bar rail it really looks good, very impressed.

John F. – Palm Beach Gardens, Florida

02/22/2020

Walnut Chicago Bar Rail Molding

I couldn’t be happier with my experience ! I placed my order on a Tuesday and received it on Saturday ! The quality and craftsmanship is perfect , Ty very much it made the install very smooth.

Darrin W. – Bristol Connecticut

11/12/2020

BR475 Red Oak Bar Rail Molding